Work under way in Carshalton

Friday March 21st and, as these pictures show,  work is well under way to improve cycling possibilities in the Grove (Park) in Carshalton.

At the side of the sports centre, running from the bridge down to paper Mill Close is a completely new path, to be shared by people on foot and on bikes. That will save the hassle of cycling round through the Sports Centre car park and having to go the wrong way against the traffic most of the time.

1 2014-03-21 14.26.14a 2 2014-03-21 14.26.38a 3 2014-03-21 14.28.00a

And this new path will join on to a revamped path, being widened at the moment for shared use, going from the bridge, up by the Bowling Green towards the High Street.

5 2014-03-21 14.27.29a 4 2014-03-21 14.26.45a

Advertisements
Posted in Greenways

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: